Electronics Assembly Knowledge, Vision & Wisdom
Operations, Productivity, Supply << Page 1 of 11 >>
These programs cover overall operations, plan productivity, issues with the supply chain and more.

Programs are sorted by published date, most recent first.
Directory Search        


Program Search        
Applying Lean Philosophies to Supply Chain Management in EMS
Applying Lean Philosophies to Supply Chain Management in EMS
A mid-tier EMS company's look at their use of technology, philosophy and partnerships to optimize its systems and facilitate growth.
Production Floor
D-PAK Voiding: A Study to Determine the Origins of D-PAK Voiding
D-PAK Voiding: A Study to Determine the Origins of D-PAK Voiding
This study looks at an analysis of why a D-PAK exhibits more voiding than other types of BTCs. Voiding results based on an analysis of several process variables.
Analysis Lab
The Quest for Reliability Standards
The Quest for Reliability Standards
Many methods simulate end-use characteristics of equipment, but a clear understanding is required to differentiate between the methods.
Analysis Lab
High Thermal, High Temperature Interconnects for Ultra High Power LEDs
High Thermal, High Temperature Interconnects for Ultra High Power LEDs
For high performance applications, ultra-high power offers cost reduction through fewer LEDs, smaller PCBs, smaller heat sinks and lighter load bearing.
Production Floor
A Review of Industry Terminology and Acronyms
A Review of Industry Terminology and Acronyms
What does the term BTC refer to? The Assembly Brothers talk about uniformity of terminology and the industry's acronyms.
Board Talk
Lean Flow on the SMT Factory Floor
How can a Lean, agile SMT operation be sustained by turning existing engineering programming and planning functions "upside down"?
Production Floor
Cost Comparison of Complex PCB Fabrication
Cost Comparison of Complex PCB Fabrication
The authors present an alternative to sequential lamination for fabricating complex PCBs, where conductive paste is used as interconnect between cores.
Production Floor
Long Term Component Storage
Long Term Component Storage
We need to store SMD components for at least 10 years. What do you recommend for a humidity and temperature settings?
Board Talk
Concentration Monitoring & Closed Loop Control
Concentration Monitoring & Closed Loop Control
In this study, the Flowsensor or acoustic concentration measurement system was evaluated at the original beta site detailing 20 days of concentration monitoring data.
Production Floor
Solder Defects and Continuous Improvement
Solder Defects and Continuous Improvement
We get a lot of questions about solder defects. Is that telling us something about what's going on in the industry? Are you settling for mediocrity? The Assembly Brothers, Phil Zarrow and Jim Hall, answer these questions.
Board Talk
Operations, Productivity, Supply << Page 1 of 11 >>